Bevel and Transfer Gears - Assemble
`
D6N Track-Type Tractor Power Train
[RENR5257]
D6N Track-Type Tractor Power Train
Bevel and Transfer Gears - Disassemble
D6N Track-Type Tractor Power Train
Steering Planetary and Brake - Disassemble
POWER TRAIN
GEAR GP
D6N Track-Type Tractor Power Train
Transmission and Bevel Gears - Remove
D6N Track-Type Tractor Power Train
Transmission and Bevel Gears - Install
D6N Track-Type Tractor Power Train
Transmission and Bevel Gears - Separate
D6N Track-Type Tractor Power Train
Transmission and Bevel Gears - Connect
D6N Track-Type Tractor Power Train
Bevel and Transfer Gears - Disassemble
D6N Track-Type Tractor Power Train
Bevel and Transfer Gears - Assemble
1.1. Assembly Procedure
Show/hide table
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 1P-2420 | Transmission Repair Stand | 1 |
C | 8T-2839 | Spanner Wrench | 1 |
E | 8T-5096 | Dial Indicator Gp | 1 |
6V-6042 | Indicator Point Gp | 1 | |
F | 8T-4122 | Hard Washer | 1 |
8B-7558 | Adapter | 1 | |
1B-3623 | Bolt | 1 | |
2P-8260 | Cylinder Liner Installer | 1 | |
G | 2P-8260 | Cylinder Liner Installer | 1 |
9U-6207 | Plate | 1 | |
031-9099 | Bolt | 1 | |
2J-3506 | Full Nut | 1 | |
8T-4994 | Hard Washer | 1 | |
H | 4C-5597 | Anti-Seize Compound | |
J | 1U-7234 | Feeler Gauge | 1 |
K | 1P-0510 | Driver Gp | 1 |
L | FT-2973 | Holding Plate | 1 |
M | 5P-3413 | Pipe Sealant |
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contamination of the hydraulic system with foreign material will reduce the service life of the hydraulic system components. To prevent contaminants from entering the hydraulic system, always plug or cap the lines, fittings, or hoses as they are disconnected. Cover any disassembled components and clean them properly before assembly. Clean the hydraulic system properly after any major component exchange or especially after a component failure, to remove any contamination. |
- Install fittings (48), if fittings (48) were removed.
- Install tube assemblies (49).
Show/hide table
Illustration 2 g00994563 - Lower the temperature of bearing cup (47).
- Install bearing cup (47) into case (31).
Show/hide table
Illustration 3 g00994149 - Install rings (43) into carrier (44).
- Install carrier (44).
- Lower the temperature of bearing cups (42) and (45). Install bearing cups (42) and (45).
- Install bearing cone (46).
Show/hide table
Illustration 4 g00994148 - Install original shims (41), cage (40), and bolts (39).
Show/hide table
Illustration 5 g00954863 - Raise the temperature of race and roller bearing (38).
- Install the race and roller bearing (38) onto shaft assembly (35).
Show/hide table
Illustration 6 g00954861 - Position gear (37). Install bolts (36).
Show/hide table
Illustration 7 g01233575 - Attach a suitable lifting device to shaft assembly (35). The weight of shaft assembly (35) is approximately
39 kg (86 lb) . - Install shaft assembly (35).
Show/hide table
Illustration 8 g00994147 - Install bearing cone (34A), washer (34), and new lock ring (33).
- Apply Tooling (H) to the threads and to the face of nut (32). Install nut (32).
- Use Tooling (C) in order to tighten nut (32) to a torque of
612 ± 68 N·m (451 ± 50 lb ft) . - Bend the tab on lock ring (33) toward nut (32).
Show/hide table
Illustration 9 g00954857 - Lower the temperature of bearing cups (30).
- Install bearing cups (30) into case (31).
Show/hide table
Illustration 10 g00971426 - Raise the temperature of bearing cones (27) and (29).
- Install bearing cone (27) onto gear (28).
- Install gear (28) into gear (23).
- Install bearing cone (29) onto gear (28).
- Position retainer (26).
- Install bolt (25).
Show/hide table
Illustration 11 g00954593 - Raise the temperature of bearing cones (24). Install bearing cones (24) onto gear (22).
Show/hide table
Illustration 12 g00954590 Note: Gears (22) and (23) must be installed into the case assembly at the same time.
- Install gear (22) and gear (23) into the case assembly.
Show/hide table
Illustration 13 g00984442 - Install bearing cup (21) into cover (19). Dimension (Z) is
4.30 mm (0.170 inch) .Show/hide tableIllustration 14 g00984467 - Position cover (19).
- Install dowels (20), if dowels (20) were removed. Install bolts (18).
- Install bolt (25) and retainer (26).
Show/hide table
Illustration 15 g00994324 - Position shim (17) that is equal to
4.30 mm (0.169 inch) onto cover (19). - Install cover (16) and bolts (15).
Show/hide table
Illustration 16 g00984480 - Install Tooling (E) and Tooling (F).
- Rotate gear (28) in order to find the high spot on the face of bearing cone (29).
- Zero Tooling (E).
- Obtain an end play measurement.
- Repeat Step 36 through Step 38 in order to ensure that an accurate measurement has been obtained.
- Remove Tooling (E) and Tooling (F).
Show/hide table
Illustration 17 g00994324 - Remove bolts (15) and cover (16).
- Remove shims (17) in order to adjust the end play. The end play should be
0.080 ± 0.050 mm (0.0031 ± 0.0020 inch) . - Install cover (16) and bolts (15).
- Repeat Step 35 through Step 43 in order to ensure that an accurate measurement has been obtained.
Show/hide table
Illustration 18 g00984518 - Install retainer (26) and bolt (25).
Show/hide table
Illustration 19 g00973888 - Lower the temperature of bearing cup (13).
- Install O-ring seal (12) and bearing cup (13) onto cage (9).
Show/hide table
Illustration 20 g00954584 - Install shims (10).
Note: Allow clearance for the bearing.
- Install cage (9) and bolts (8).
Show/hide table
Illustration 21 g00994870 - Use Tooling (G) and Tooling (E) in order to check the end play.
- Rotate gear (22) in order to find the high spot on the face of bearing cone (24).
- Zero Tooling (E).
- Obtain an end play measurement.
- Repeat Step 36 through Step 38 in order to ensure that an accurate measurement has been obtained.
- Remove Tooling (E) and Tooling (G).
Show/hide table
Illustration 22 g00954584 - Remove bolts (8) and cage (9).
- Add or remove shims (10), as required.
- Install cage (9) and bolts (8).
- Repeat Step 50 through Step 58 in order to ensure accuracy.
Show/hide table
Illustration 23 g00974756 - Remove bolts (8) and cage (9).
Show/hide table
Illustration 24 g00974755 - Lower the temperature of bearing (14).
- Install bearing (14) into cage (9).
- Apply Tooling (M) into the seal bore in cage (9).
- Use Tooling (K) in order to install seal (11) into cage (9).
Show/hide table
Illustration 25 g00974756 - Position cage (9).
- Install bolts (8). Tighten bolts (8) to a torque of
135 ± 15 N·m (100 ± 11 lb ft) .Show/hide tableIllustration 26 g00994736 - Remove bolt (25). Install Tooling (L) and bolt (25).
- Install Tooling (E).
- Make three backlash measurements at 120 degrees intervals. The backlash should be
0.20 ± 0.10 mm (0.008 ± 0.004 inch) . - Add or remove shims (42) in order to obtain the correct settings.
Show/hide table
Illustration 27 g00954581 - Install bracket (6).
- Install sensors (5). Use Tooling (J) in order to set the distance between the face of the sensors (5) and the gear teeth. The distance must be
0.71 ± 0.18 mm (0.028 ± 0.007 inch) . Tighten the nut to a torque of25 ± 5 N·m (18 ± 4 lb ft) . - Connect harness assemblies (7).
Show/hide table
Illustration 28 g00954580 - Install pins (3), if pins (3) have been removed.
- Install O-ring seals (4).
Show/hide table
Illustration 29 g00954579 - Install bracket assemblies (2).
Show/hide table
Illustration 30 g00959670 - Remove bevel and transfer gears (1) from Tooling (A).
Show/hide table
Illustration 1 | g00994564 |
End By:
- Connect the transmission and bevel gears. Refer to Disassembly and Assembly, "Transmission and Bevel Gears - Connect".
Information System:
D6N Track-Type Tractor Power Train
Bevel and Transfer Gears - Disassemble
988H Wheel Loader
Cooling System Coolant Sample (Level 2) - Obtain
988H Wheel Loader
Cooling System Coolant Sample (Level 1) - Obtain
TH62, TH63, TH82 and TH83 Telehandlers
Engine Starting
2003/06/09
New Software Is Now Used {7620}
TH62, TH63, TH82 and TH83 Telehandlers
Work Tools
TH62, TH63, TH82 and TH83 Telehandlers
Operation Information
2003/05/05
New Hardware for the Front Engine Mounting Support is Available {1154}
AD45 and AE40 II Underground Articulated Trucks
Maintenance Interval Schedule
3054E Industrial Engine
Fuel Injection Pump - Remove
IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Engine Supplement
Engine - Install
C4.4 Industrial Engine
Engine Oil Level - Check
Installation of Fuel/Water Separator{1260, 1263}
3126B Machine Engines
Engine Pressure Sensor Open or Short Circuit - Test
2003/05/05
New Spider Assembly Reduces Erosion on the Tips of Fan Blades {1356}
TH62, TH63, TH82 and TH83 Telehandlers
Reference Material
TH62, TH63, TH82 and TH83 Telehandlers
Quick Coupler - Rear
953C Track-Type Loader
Track - Check/Adjust
TH62, TH63, TH82 and TH83 Telehandlers
Safety Messages
3044C Industrial Engine and Engines for Caterpillar Built Machines
Fuel Injection Nozzle - Test
AD30 Underground Articulated Truck Braking System
General Information
3046 Engine for Caterpillar Built Machines
Fuel Injection Timing - Check - Distributor Pump
Installation of Factory Ordered High Intensity Discharge Lights{1429, 1434}
973K Track-Type Loader
Final Drive Oil Sample - Obtain