3054E Industrial Engine Fuel Injection Pump - Remove Caterpillar


Fuel Injection Pump - Remove
`
1.1. Removal Procedure

Removal Procedure

Table 1
Required Tools(1) 
Tool  Part Number  Part Name  Qty 
A  9U-6198  Crankshaft Turning Tool 
B  230-6284  Timing Pin (Camshaft) 
C  230-6283  Timing Pin (Crankshaft) 
D  150-3992  Timing Pin (Fuel Injection Pump) 
E  157-3719  Ratchet Wrench 
ZZ  9U-7067  Cap 
9U-7069 Cap 
(1) SERVICE DATA: TOOLING (ZZ) WILL NOT BE IDENTIFIED IN PHOTOGRAPHS IN THE REMOVAL OR THE INSTALLATION. THIS TOOLING IS SHOWN IN ORDER TO ASSIST THE EXPERIENCED SERVICEMAN.

Start By:

  1. Remove the crankshaft pulley. Refer to Disassembly and Assembly, "Crankshaft Pulley - Remove and Install".

  2. Remove the front cover. Refer to Disassembly and Assembly, "Front Cover - Remove and Install".

  3. Remove the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines - Remove and Install".

  4. Remove the air compressor, if equipped. Refer to Disassembly and Assembly, "Air Compressor - Remove and Install".


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


  1. Use the Tooling (A) to ensure that the No. 1 piston is at the top center position on the compression stroke. Refer to Testing and Adjusting, "Finding Top Center Position for No. 1 Piston".

    Note: Install the Tooling (B) through the camshaft gear. Install the Tooling (C) into the crankshaft web.



    Illustration 1g00996922

  2. Insert the Tooling (D) in the hole of fuel injection pump gear (2), through the slot in the hub and into the timing hole of the Fuel Injection Pump (X). If the Tooling (D) can be fully inserted, the fuel injection timing is correct. There should be no resistance when the Tooling (D) is inserted.

    Note: Do not remove the hub nut (1) from the shaft of the fuel injection pump. The hub of the fuel injection pump is installed in the correct position at the factory in order to ensure proper timing. If hub nut (1) is removed and the hub is removed, the hub will need to be accurately installed on the shaft of the fuel injection pump by the use of special equipment. Refer to your AVSpare Dealer for more information.

    Note: Some Bosch VP30 fuel injection pumps do not have a locking screw. To ensure that the pump is timed correctly, refer to Systems Operation, Testing and Adjusting, "Fuel Injection Timing - Check".



    Illustration 2g00995133

  3. Loosen the setscrew (4). Remove the spacer (5) in order to allow the setscrew (4) to tighten against the shaft of the fuel injection pump (6). Rotate the fuel injection pump gear in a counterclockwise direction in order to remove the backlash. Tighten the setscrew (4) to a torque of 31 N·m (22.8 lb ft).

    Note: The setscrew (4) must be tightened in order to prevent the shaft of the fuel injection pump from rotating.

  4. Remove the Tooling (D) from the body of the fuel injection pump.

  5. Remove the four setscrews (3) and the washers from the hub of the fuel injection pump. Remove the fuel injection pump gear (2).


    Illustration 3g00994376

  6. Disconnect the tube assembly (9). Disconnect the tube assembly (10) from the fuel injection pump.

  7. Pull the locking mechanism in order to disconnect harness assembly (7).

  8. Remove the nut and setscrew (13). If necessary, remove the setscrew and the bracket (12) from the cylinder block.

  9. Remove the three setscrews (11) in order to remove the fuel injection pump.

  10. Remove the fuel injection pump from the front housing. Remove the O-ring seal (8) from the fuel injection pump.

Information System:

IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Engine Supplement Engine - Install
C4.4 Industrial Engine Engine Oil Level - Check
TH62, TH63, TH82 and TH83 Telehandlers Specifications
963C Track-Type Loader Power Train Calibration Procedures
2003/04/21 A Check Valve Is Used to Eliminate the Loss of Oil When the Hydraulic Filter Is Replaced {5051, 5067}
2003/06/09 New Software Released for Machine Security System (MSS) {7620}
990 Series II Wheel Loader Machine Systems Bucket - Install
3044C Industrial Engine and Engines for Caterpillar Built Machines Fuel Injection Nozzles
IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Engine Supplement Engine - Remove
963C Track-Type Loader Fire Prevention and Explosion Prevention
924G and 924GZ Wheel Loaders Machine Systems Gear Motor (Hydraulic Fan) - Install
AD30 Underground Articulated Truck Parking Brake Manual Release
AD45 and AE40 II Underground Articulated Trucks Maintenance Interval Schedule
2003/05/05 New Hardware for the Front Engine Mounting Support is Available {1154}
TH62, TH63, TH82 and TH83 Telehandlers Operation Information
TH62, TH63, TH82 and TH83 Telehandlers Work Tools
2003/06/09 New Software Is Now Used {7620}
TH62, TH63, TH82 and TH83 Telehandlers Engine Starting
988H Wheel Loader Cooling System Coolant Sample (Level 1) - Obtain
988H Wheel Loader Cooling System Coolant Sample (Level 2) - Obtain
D6N Track-Type Tractor Power Train Bevel and Transfer Gears - Disassemble
D6N Track-Type Tractor Power Train Bevel and Transfer Gears - Assemble
Installation of Fuel/Water Separator{1260, 1263}
3126B Machine Engines Engine Pressure Sensor Open or Short Circuit - Test