1.1. Installation Procedure
2.1. Lower Pins (B Pins)
3.1. Upper pin (C Pin)

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-0520     Driver Group     1    
B     1U-9200     Lever Puller Hoist     1    
C     7M-7456     Bearing Mount Compound     1    
D     5P-0960     Molybdenum Grease     1    


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


Check the condition of the seals that are located in the end of the arm and bearing assemblies. If one or more seals are damaged, replace the damaged seals. If one or more seals are removed, replace the removed seals. Place Tooling C around the bores for the seals on each lift arm before installation. Use Tooling A in order to install the seals into the arm and bearing assembly.




Illustration 1g00994243

Install the seals with the seal lip toward the outside of the arm and bearing assembly.

Lower Pins (B Pins)

Note: The Pin joints are a slip fit. Proper alignment is important. Do not use excessive force in order to install the pin assemblies.




    Illustration 2g00993549



    Illustration 3g00993555

  1. Clean the bores for both pin joints on the work tool. Clean the bores for the pin joints on the arm and bearing assemblies. Apply a light coat of Tooling D to all the bores.



    Illustration 4g00889552

  1. Start the engine. Move the machine toward the work tool. Position the arm and bearing assemblies with the bores in the work tool.



    Illustration 5g00993537

  1. Align the bores in the end of the lift arm and bearing assembly (2) with the bores in the work tool. Install shims (1) to each pin joint, as required.

    Note: Use the proper shims that are required to center the arm and bearing assembly to the hinge plates on the work tool. Reduce the maximum gap to less than 1.0 mm (0.04 inch) between the hinge plate and arm and bearing assembly (2) .




    Illustration 6g00993637



    Illustration 7g00993599

  1. After the bores are aligned, attach a suitable lifting device and the hoist to pin assembly (3). Insert pin assembly (3) into the bore. Remove the suitable lifting device from pin assembly (3). Continue to push the pin assembly to full depth. The weight of pin assembly (3) is approximately 60 kg (130 lb).



    Illustration 8g00993822

  1. Position the metal flag on pin assembly (3) in the locking position.



    Illustration 9g00993612

  1. Place plate (5) in position, and insert bolts (4). Then, tighten the bolts.

  1. Perform Step 3 through Step 6 for the other side of the work tool.

Upper pin (C Pin)

Note: The pin joint is a slip fit. Proper alignment is important. Do not use excessive force in order to install the pin assembly.




    Illustration 10g00993799



    Illustration 11g00993800

  1. Attach a suitable lifting device and Tooling (B) to the lever assembly. Attach the hook of Tooling (B) to link assembly (1) with a suitable lifting device. The weight of the link assembly with a removed pin assembly is approximately 220 kg (480 lb).



    Illustration 12g00993808



    Illustration 13g00993801

  1. Install pin assembly (6). The weight of pin assembly (3) is approximately 60 kg (130 lb).



    Illustration 14g00993856

  1. Remove the suitable lifting device from pin assembly (6). Install pin assembly (6) in all the way and position the metal flag into the locking position. Remove the suitable lifting device from link assembly (7). Remove Tooling (B) and the suitable lifting device from the lever assembly.



    Illustration 15g00993815

  1. Position plate (8) in place and insert bolts (9). Then, tighten bolts (9) .

  1. Lubricate all of the joints for each pin assembly.

Note: Use the following steps in order to perform the correct break-in procedure for the work tool.

  1. Raise the work tool to approximately 1/3 maximum height.

  1. Lower the work tool to the ground and apply slight downward pressure. The downward pressure reverses the direction on the load on the pin.

  1. Repeat the procedure for 20 to 30 cycles. Then, gradually increase the height of the work tool at each cycle until the maximum height is reached.

  1. Lubricate all the joints on each pin assembly.

End By: Separate the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect".

Information System:

3044C Industrial Engine and Engines for Caterpillar Built Machines Fuel Injection Nozzles
IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Engine Supplement Engine - Remove
963C Track-Type Loader Fire Prevention and Explosion Prevention
924G and 924GZ Wheel Loaders Machine Systems Gear Motor (Hydraulic Fan) - Install
AD30 Underground Articulated Truck Parking Brake Manual Release
AD30 Underground Articulated Truck Braking System Parking Brake (Automatic Function)
AD30 Underground Articulated Truck Circuit Breakers - Reset
924G and 924GZ Wheel Loaders Machine Systems Gear Motor (Hydraulic Fan) - Remove
Supplement for the 973C Track-Type Loader With the Steel Mill Arrangement{7000}
Installation of High Intensity Discharge Lights{1434}
C-12 Marine Engines Fuel Temperature Sensor - Remove and Install
TH350B, TH355B, TH360B and TH460B Telehandlers Circuit Breakers - Test
2003/06/09 New Software Released for Machine Security System (MSS) {7620}
2003/04/21 A Check Valve Is Used to Eliminate the Loss of Oil When the Hydraulic Filter Is Replaced {5051, 5067}
963C Track-Type Loader Power Train Calibration Procedures
TH62, TH63, TH82 and TH83 Telehandlers Specifications
C4.4 Industrial Engine Engine Oil Level - Check
IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Engine Supplement Engine - Install
3054E Industrial Engine Fuel Injection Pump - Remove
AD45 and AE40 II Underground Articulated Trucks Maintenance Interval Schedule
2003/05/05 New Hardware for the Front Engine Mounting Support is Available {1154}
TH62, TH63, TH82 and TH83 Telehandlers Operation Information
TH62, TH63, TH82 and TH83 Telehandlers Work Tools
2003/06/09 New Software Is Now Used {7620}