C7 Engines for Caterpillar Built Machines Crankshaft Main Bearings - Remove Caterpillar


Crankshaft Main Bearings - Remove
`
1.1. Removal Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
2P-5518  Main Bearing Tool 

Start By:

  1. Remove the engine oil pump. Refer to Disassembly and Assembly, "Engine Oil Pump - Remove".


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.




    Illustration 1g00988316

  1. Remove bolts (1) that hold crankshaft main bearing cap (2). Remove crankshaft main bearing cap (2).

  2. Remove the lower half of the crankshaft main bearing from crankshaft main bearing cap (2).


    Illustration 2g00988318


    NOTICE

    If the crankshaft is turned in the wrong direction, the tab of the crankshaft main bearing will be pushed between the crankshaft and the cylinder block. this can cause damage to either or both the crankshaft and the cylinder block.


  3. Use the following steps in order to remove the upper half of crankshaft main bearings:

    1. Turn the crankshaft until Tooling (A) can be installed in the crankshaft journal. Install Tooling (A).

    2. Turn the crankshaft in order to remove the upper half of the crankshaft main bearing. Tooling (A) must first contact the crankshaft main bearing opposite the tab end of the crankshaft main bearing. In order to get the tab out first, the crankshaft must be turned in the correct direction.

    3. Check the condition of the crankshaft main bearings. Refer to the Guideline For Reusable Parts, SEBF8009, "Main and Connecting Rod Bearings" or refer to the Guideline For Reusable Parts, SEBV0544, "Engine Bearings and Crankshafts".

Information System:

IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Transmission Control (Shift Lever)
C7 Engines for Caterpillar Built Machines Pistons and Connecting Rods - Install
C7 Engines for Caterpillar Built Machines Pistons and Connecting Rods - Remove
TH103 Telehandler Braking System - Test
Supplement for the 973C Track-Type Loader with the Steel Mill Arrangement{7000}
Field Installation of the Programmable Hydraulic Pilot Valve Arrangements{7620}
TH103 Telehandler Specifications
D6N Track-Type Tractor Power Train Track Roller Frame - Install
D6N Track-Type Tractor Power Train Track Roller Frame - Remove
D6N Track-Type Tractor Power Train Track Adjuster - Remove and Install
D6N Track-Type Tractor Power Train Pivot Bar-Remove and Install
D6N Track-Type Tractor Power Train Front Track Roller Frame - Install
963C Track-Type Loader Capacities (Refill)
Bench Test Procedure for a 928G Wheel Loader andIT28G Integrated Toolcarrier Transmission with a Splined Coupling Drive{3030, 3066, 3073}
TH62, TH63, TH82 and TH83 Telehandlers Lifting Capacities
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Metering Pump (HMU) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Control Valve (Service) - Remove and Install
C7 Engines for Caterpillar Built Machines Crankshaft Main Bearings - Install
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Proportional Manifold (Traction Control System) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Proportional Manifold (Traction Control System) - Disassemble
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Proportional Manifold (Traction Control System) - Assemble
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train Transmission - Install
613C Series II Wheel Tractor-Scraper Hydraulic System Bowl Circuit
Installation of Direct Conversion Center Tread Idlers {4159}