C7 Engines for Caterpillar Built Machines Pistons and Connecting Rods - Install Caterpillar


Pistons and Connecting Rods - Install
`
1.1. Installation Procedure

Installation Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     173-5529     Piston Ring Compressor     1    
B     4C-5593     Anti-Seize Compound     1    


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


  1. Apply clean engine oil to the pistons, the piston rings, and the cylinder bore.



    Illustration 1g00954373

  1. Position the piston rings so that the end gaps are located 120 degrees from each other. Install Tooling (A) in order to compress the piston rings.

    Note: Install the piston and connecting rod so that the forging number on the connecting rod points toward the flywheel end of the engine.

  1. With the number one crankshaft throw at the bottom center, install the piston and connecting rod in the engine. Ensure that the proper piston and connecting rod are in the corresponding cylinder with the bearing retainer notch toward the right side of the engine.

  1. Line up the piston and the connecting rod with the crankshaft. Use a soft faced hammer and tap the piston into the cylinder bore until Tooling (A) comes off the piston.



    Illustration 2g01126089



    Illustration 3g01126088

  1. Before connecting rod (3) comes in contact with the crankshaft, install the upper half of connecting rod bearing (4) . Ensure that the bearing tab engages with the slot in connecting rod (3) .

  1. Apply clean engine oil to the surface of the upper half of connecting rod bearing (4) . Use a soft faced hammer in order to tap the piston into the cylinder bore while you guide connecting rod (3) onto the crankshaft.

  1. Place the lower half of connecting rod bearing (4) in corresponding connecting rod cap (2) . Ensure that the bearing tab engages with the groove in connecting rod cap (2) .

  1. Apply clean engine oil to the surface of the lower half of connecting rod bearing (4) . Install connecting rod bearing cap (2) on connecting rod (3) . Ensure that the number on connecting rod cap (2) matches the number on connecting rod (3) . Ensure that the numbers are on the same side.

  1. Lubricate the new connecting rod bolts with Tooling (B) .

  1. Install new bolts (1) . Tighten bolts (1) to a torque of 70 ± 5 N·m (52 ± 4 lb ft).

    Note: Refer to Truck Engine News, SEBD6775, "New Fractured Connecting Rod Has Been Released " for the proper torque procedure on Reman Connecting Rods.

  1. Place an index mark on each bolt. Tighten each bolt (1) for an additional 120 ± 5 degrees (1/3 turn).

End By:

  1. Install the piston cooling jets. Refer to the Disassembly and Assembly Manual, "Piston Cooling Jets - Remove and Install".
  2. Install the engine oil pump. Refer to the Disassembly and Assembly Manual, "Engine Oil Pump - Install".
  3. Install the cylinder head. Refer to the Disassembly and Assembly Manual, "Cylinder Head - Install".

Information System:

C7 Engines for Caterpillar Built Machines Pistons and Connecting Rods - Remove
TH103 Telehandler Braking System - Test
Supplement for the 973C Track-Type Loader with the Steel Mill Arrangement{7000}
Field Installation of the Programmable Hydraulic Pilot Valve Arrangements{7620}
TH103 Telehandler Specifications
D6N Track-Type Tractor Power Train Track Roller Frame - Install
D6N Track-Type Tractor Power Train Track Roller Frame - Remove
D6N Track-Type Tractor Power Train Track Adjuster - Remove and Install
D6N Track-Type Tractor Power Train Pivot Bar-Remove and Install
D6N Track-Type Tractor Power Train Front Track Roller Frame - Install
D6N Track-Type Tractor Power Train Front Track Roller Frame - Remove
D6N Track-Type Tractor Power Train Equalizer Bar - Remove
IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Transmission Control (Shift Lever)
C7 Engines for Caterpillar Built Machines Crankshaft Main Bearings - Remove
963C Track-Type Loader Capacities (Refill)
Bench Test Procedure for a 928G Wheel Loader andIT28G Integrated Toolcarrier Transmission with a Splined Coupling Drive{3030, 3066, 3073}
TH62, TH63, TH82 and TH83 Telehandlers Lifting Capacities
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Metering Pump (HMU) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Control Valve (Service) - Remove and Install
C7 Engines for Caterpillar Built Machines Crankshaft Main Bearings - Install
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Proportional Manifold (Traction Control System) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Proportional Manifold (Traction Control System) - Disassemble
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Brake Proportional Manifold (Traction Control System) - Assemble
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train Transmission - Install