980G Wheel Loader Power Train Torque Converter - Assemble - Heavy duty Caterpillar


Torque Converter - Assemble - Heavy duty
`
1.1. Assembly Procedure

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
138-7573  Link Bracket 
8T-5096  Dial Indicator Test Group 
5P-2390 Gauge Tool Group 
1P-0520  Driver Group 

Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement.

Note: Apply oil to all of the bearings before assembly.



    Illustration 1g00504278

  1. Use Tooling (C) to install sleeve bearing (59) in cover assembly (57). Sleeve bearing (59) must be even with the outside surface of cover assembly (57).


    Illustration 2g00504279

  2. Install cover assembly (57) to rotating housing (39).


    Illustration 3g00503564

  3. Install ring seal (58) to rotating housing (39).

  4. Install eight bolts (56) and the washers. Tighten the bolts to a torque of 30 ± 5 N·m (22 ± 4 lb ft).


    Illustration 4g00504307

  5. Install thrust bearing race (54), thrust bearing (55), and thrust bearing race (54) to cover assembly (57).


    Illustration 5g00504312

  6. Install retaining ring (53) in turbine hub (51).


    Illustration 6g00504313

  7. Install converter turbine (50) on turbine hub (51).


    Illustration 7g00504315

  8. Install twenty bolts (52). Tighten the bolts to a torque of 50 ± 7 N·m (37 ± 5 lb ft).


    Illustration 8g00504382

  9. Install turbine hub (51) and converter turbine (50) as a unit to rotating housing (39).


    Illustration 9g00503538

  10. Install two thrust bearing races (49) and the bearing to the hub.


    Illustration 10g00504436

  11. Use Tooling (C) to install sleeve bearing (48) to carrier assembly (44). Bearing sleeve (48) must be even with the counterbore of carrier assembly (44).


    Illustration 11g00504882

  12. Install retainer ring (47) in stator (46).


    Illustration 12g00504931

  13. Position carrier assembly (44) on a wood block.

  14. Use proper equipment to handle stator (46). Heat stator (46) to a maximum temperature of 121°C (250°F) for one hour.

  15. Install stator (46) on carrier assembly (44).


    Illustration 13g00504935

  16. Install snap ring (45) in stator (46).


    Illustration 14g00505049

  17. Install stator (46) and carrier assembly (44) in rotating housing (39).


    Illustration 15g00503352

  18. Install two thrust bearing races (43) and the thrust bearing to the carrier assembly.


    Illustration 16g00503351

  19. Position impeller hub (42) on a wood block.

  20. Install converter impeller (41) on impeller hub (42).


    Illustration 17g00503350

  21. Install drive flange (38) on converter impeller (41).


    Illustration 18g00503348

  22. Install twelve bolts (40). Tighten the bolts to a torque of 80 ± 10 N·m (60 ± 7 lb ft).


    Illustration 19g00503345

  23. Install drive flange (38) on rotating housing (39). The weight of drive flange (38) is 23 kg (51 lb).

  24. Install 36 bolts (37) and the washers. Tighten the bolts to a torque of 30 ± 5 N·m (22 ± 4 lb ft).


    Illustration 20g00505183

  25. Install retaining ring (36) in the groove of drive gear (35).


    Illustration 21g00505224

  26. Use the proper equipment to handle outer bearing race (60). Lower the temperature of outer bearing race (60).

  27. Install outer bearing race (60) in drive gear (35). Make sure that outer bearing race (60) makes contact with retaining ring (36).


    Illustration 22g00505319

  28. Install drive gear (35) on drive flange (38).


    Illustration 23g00505349

  29. Install twelve bolts (34) and the washers. Tighten the bolts to a torque of 50 ± 7 N·m (37 ± 5 lb ft).


    Illustration 24g00505352

  30. Use the proper equipment to handle inner bearing (33). Heat inner bearing (33) to a maximum temperature of 135°C (275°F). Install inner bearing (33) on bearing carrier (28).


    Illustration 25g00505358

  31. Install retaining ring (32) in the groove of bearing carrier (28).


    Illustration 26g00505359

  32. Use the proper equipment to handle ring carrier (31). Heat ring carrier (31) to a maximum temperature of 135°C (275°F). Install ring carrier (31) on bearing carrier (28).


    Illustration 27g00505387

  33. Install seal ring (30) on ring carrier (31).

  34. Install O-ring seal (29) on bearing carrier (28).


    Illustration 28g00505395

  35. Install bearing carrier (28) in drive flange (38).


    Illustration 29g00505423

  36. Install retaining ring (27) in carrier assembly (44) in order to hold bearing carrier (28) in place.


    Illustration 30g00503312

  37. Install two studs (26) in torque converter housing assembly (2). Tighten the studs to a torque of 100 ± 15 N·m (74 ± 11 lb ft).


    Illustration 31g00505444

  38. Install retaining ring (24) in the groove of idler gear (15).


    Illustration 32g00505465

  39. Use the proper equipment to handle bearing cup (25). Lower the temperature of bearing cup (25). Install bearing cup (25) in idler gear (15).


    Illustration 33g00505470

  40. Flip idler gear (15) to the opposite side. Install bearing cup spacer (23) in idler gear (15). The notch in bearing cup spacer (23) must be aligned with retaining ring (24).


    Illustration 34g00505479

  41. Use the proper equipment to handle bearing cup (22). Lower the temperature of bearing cup (22). Install bearing cup (22) in idler gear (15).


    Illustration 35g00505480

  42. Install bearing cone (21), bearing cone spacer (20) and bearing cone (19) in idler gear (15).


    Illustration 36g00505482

  43. Apply clean hydraulic oil on O-ring seal (17). Install O-ring seal (17) on shaft assembly (18).


    Illustration 37g00505508

  44. Install 1/2" - 13 NC guide pin (61) in shaft assembly (18).

  45. Hold transfer gear (15) in position in torque converter housing assembly (2). Install shaft assembly (18).

  46. Remove guide pin (61) from shaft assembly (18).


    Illustration 38g00505517

  47. Install bolt (14) that holds shaft assembly (18) in place in torque converter housing assembly (2). Tighten the bolt to a torque of 120 ± 20 N·m (90 ± 15 lb ft).


    Illustration 39g00505572

  48. Use the proper equipment to handle bearing cones (12). Heat bearing cones to a maximum temperature of 135°C (275°F). Install a bearing cone (12) on each side of pump drive gear (11).


    Illustration 40g00505585

  49. Use the proper equipment to handle bearing cup (13). Lower the temperature of bearing cup (13). Install bearing cup (13) in torque converter housing assembly (2).


    Illustration 41g00505591

  50. Install pump drive gear (11) in torque converter housing assembly (2).


    Illustration 42g00505594

  51. Use the proper equipment to handle bearing cup (8). Lower the temperature of bearing cup (8). Install bearing cup (8) in pump adapter (6).


    Illustration 43g00505623

  52. Install shims (9) on pump adapter (6).

  53. Apply clean hydraulic oil on O-ring seal (10). Install O-ring seal (10) on pump adapter (6).


    Illustration 44g00505666

  54. Install two 3/8" - 16 NC guide pins (62) in torque converter housing assembly (2).

  55. Install pump adapter (6) on torque converter housing assembly (2).


    Illustration 45g00505669

  56. Install thirteen bolts (5) and the washers.

  57. Use Tooling (B) to check bearing end play. The bearing end play must be 0.15 ± 0.05 mm (.006 ± .002 inch). Add or remove shims in order to get the correct bearing end play.

    Note: If end play is less than 0.10 mm (.004 inch) add additional shims. If end play is greater than 0.20 mm (.008 inch) remove shims.



    Illustration 46g00505670

  58. Apply clean hydraulic oil on O-ring seal (4). Install O-ring seal (4) on torque converter housing assembly (2).


    Illustration 47g01022823

  59. Install two 1/2" - 13 NC guide pins (63) in the carrier assembly.

  60. Install Tooling (A) to torque converter housing assembly (2), as shown. Attach a hoist and suitable lifting chains to Tooling (A). Use the hoist to carefully install torque converter housing assembly (2) on the torque converter.


    Illustration 48g00503225

  61. Install eight bolts (1) and the washers to torque converter housing assembly (2). Tighten the bolts to a torque of 120 ± 20 N·m (90 ± 15 lb ft).

End By:

  1. Connect the torque converter to the transmission and to the output transfer gears. Refer to Disassembly and Assembly, "Torque Converter to Transmission, Output Transfer Gears - Connect" for the machine that is being serviced.

Information System:

AD30 Underground Articulated Truck Braking System Service and Parking Brake
IT28G Integrated Toolcarrier and 924G, 924GZ and 928G Wheel Loaders Engine Supplement Crankshaft Front Seal - Install
2003/03/24 Special Instruction, REHS1578, "Installation Instructions for the 9W-1494 Service Meter Kit " Is Available {7478}
938G Wheel Loader and IT38G Integrated Toolcarrier Safety Messages
D6N Track-Type Tractor Machine Systems Bottom Guard - Install
D6N Track-Type Tractor Machine Systems Bottom Guard - Remove
Replacement of Implement Pump with Gear Pump{5055, 5084}
980G Wheel Loader Power Train Torque Converter - Disassemble - Heavy Duty
3044C Industrial Engine and Engines for Caterpillar Built Machines Crankshaft
3046 Engine for Caterpillar Built Machines Connecting Rod - Inspect
D6N Track-Type Tractor Machine Systems Battery - Remove and Install
C-9 Engine for Caterpillar Built Machines Diagnostic Codes
980H Wheel Loader Power Train Torque Converter (Freewheel Stator) - Disassemble
980H Wheel Loader Power Train Torque Converter (Freewheel Stator) - Assemble
3034 Engine for Caterpillar Built Machines Crankshaft - Remove
D6N Track-Type Tractor Machine Systems Rollover Protective Structure (ROPS) - Remove and Install
D11R Track-Type Tractor Operation Information
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Transmission - Assemble
2003/03/24 A New Electronic Controller for the Air Inlet Heater Improves the Engine Starting Ability {1090}
980G Wheel Loader Power Train Transmission Planetary - Disassemble - Standard
TH220B, TH330B and TH340B Telehandlers Boom Wear Pad Clearance - Inspect/Adjust
980G Wheel Loader Power Train Transmission Planetary - Assemble - Standard
3044C Industrial Engine and Engines for Caterpillar Built Machines Engine Valve Lash - Inspect/Adjust
651E and 657E Wheel Tractor-Scrapers Hydraulic System Cushion-Hitch Circuit