938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Modulating Valve (Transmission Clutch) - Install Caterpillar


Modulating Valve (Transmission Clutch) - Install
`
1.1. Installation Procedure

Installation Procedure

Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement.




    Illustration 1g00979535

  1. Install modulation valve (9) and install bolts (8). Repeat the previous steps for the five remaining modulation valves.



    Illustration 2g00979528

  1. Position the harness assemblies to the original location. Connect harness assemblies (2), (3), (4), (5), (6), and (7).



    Illustration 3g00979527

  1. Connect hose assembly (1) .

End By: Install the cab. Refer to Disassembly and Assembly, "Cab - Install".

Information System:

2003/06/02 New Printer Is Used for Caterpillar Payload Control System (PCS) {749P}
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Modulating Valve (Transmission Clutch) - Remove
TH350B, TH355B, TH360B and TH460B Telehandlers Longitudinal Stability Indicator - Test
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Assemble
D6R Series II Track-Type Tractor Reference Material
D6R Series II Track-Type Tractor Operation
D5N Track-Type Tractor Power Train Track Roller Frame - Install
D5N Track-Type Tractor Power Train Track Roller Frame - Remove
TH220B, TH330B and TH340B Telehandlers Tire Shipping Pressure
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Disassemble
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Assemble - Fixed
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train Transmission - Remove
TH350B, TH355B, TH360B and TH460B Telehandlers Lifting Capacities
D6R Series II Track-Type Tractor Heating and Air Conditioning Control
TH220B, TH330B and TH340B Telehandlers Caterpillar Approved Work Tools
2003/03/10 The Suction Line Filter Group for the Transmission is Relocated {3016, 3067, 3154}
2003/03/10 Explanation of Transmission Oil Temperature Sensors {5574}
980G Series II Wheel Loader Braking System Hydraulic Oil Contamination - Test
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Drive Shaft (Center) - Remove and Install
D6N Track-Type Tractor Machine Systems Bulldozer Control Valve - Remove
D6N Track-Type Tractor Machine Systems Bulldozer Control Valve - Install
D5N Track-Type Tractor Power Train Final Drive - Disassemble
D5N Track-Type Tractor Power Train Final Drive - Assemble
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Hydraulic Tank - Remove