938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Disassemble Caterpillar


Relief Valve (Transmission Hydraulic Control) - Disassemble
`
1.1. Disassembly Procedure

Disassembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-1853     Retaining Ring Pliers     1    

Start By:

  1. Remove the relief valve. Refer to Disassembly and Assembly, "Relief Valve (Transmission Hydraulic Control) - Remove".

Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.




    Illustration 1g00979403

  1. Remove bolts (1) and remove cover (2) .



    Illustration 2g00979407

    ------ WARNING! ------

    Personal injury can result from being struck by parts propelled by a released spring force.

    Make sure to wear all necessary protective equipment.

    Follow the recommended procedure and use all recommended tooling to release the spring force.

    ----------------------

  1. Remove bolts (3) and remove cover (4) .



    Illustration 3g00979409

  1. Remove load piston (10), spring (9), spool assembly (8), and slug (11) from body (12) .

  1. Use Tooling (A) to remove retaining ring (13). Remove retainer (5), spring (6), and ball (7) from spool (8) .



    Illustration 4g00979416

  1. Remove fitting (14), fitting (15), and plug (16) from body (12) .

Information System:

938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Assemble - Fixed
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train Transmission - Remove
TH210 and TH215 Telehandlers Power Train Transfer Gears - Assemble
TH220B, TH330B and TH340B Telehandlers Specifications
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Disassemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Transmission Oil Pump - Install
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Hydraulic System Hydraulic Fan System - Reversing Fan
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Transmission Oil Pump - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Power Train Guard (Transmission) - Remove and Install
D6N Track-Type Tractor Power Train Final Drive Planetary Carrier (In Chassis) - Install
D6N Track-Type Tractor Power Train Final Drive Planetary Carrier (In Chassis) - Remove
TH220B, TH330B and TH340B Telehandlers Tire Shipping Pressure
D5N Track-Type Tractor Power Train Track Roller Frame - Remove
D5N Track-Type Tractor Power Train Track Roller Frame - Install
D6R Series II Track-Type Tractor Operation
D6R Series II Track-Type Tractor Reference Material
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Assemble
TH350B, TH355B, TH360B and TH460B Telehandlers Longitudinal Stability Indicator - Test
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Modulating Valve (Transmission Clutch) - Remove
2003/06/02 New Printer Is Used for Caterpillar Payload Control System (PCS) {749P}
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Modulating Valve (Transmission Clutch) - Install
TH350B, TH355B, TH360B and TH460B Telehandlers Lifting Capacities
D6R Series II Track-Type Tractor Heating and Air Conditioning Control