Relief Valve (Transmission Hydraulic Control) - Disassemble
`
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
[RENR6068]
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Assemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Assemble
POWER TRAIN
VALVE GP-RELIEF
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Disassemble
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Assemble
1.1. Disassembly Procedure
Disassembly Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-1853     | Retaining Ring Pliers     | 1     |
Start By:
- Remove the relief valve. Refer to Disassembly and Assembly, "Relief Valve (Transmission Hydraulic Control) - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.
- Remove bolts (1) and remove cover (2) .
Show/hide table
![]() | |
Illustration 1 | g00979403 |
- Remove bolts (3) and remove cover (4) .
Show/hide table
![]() | |
Illustration 2 | g00979407 |
Show/hide table
![]() |
Personal injury can result from being struck by parts propelled by a released spring force. Make sure to wear all necessary protective equipment. Follow the recommended procedure and use all recommended tooling to release the spring force. |
![]() |
- Remove load piston (10), spring (9), spool assembly (8), and slug (11) from body (12) .
Show/hide table
![]() | |
Illustration 3 | g00979409 |
- Use Tooling (A) to remove retaining ring (13). Remove retainer (5), spring (6), and ball (7) from spool (8) .
- Remove fitting (14), fitting (15), and plug (16) from body (12) .
Show/hide table
![]() | |
Illustration 4 | g00979416 |
Information System:
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Assemble - Fixed
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train
Transmission - Remove
TH210 and TH215 Telehandlers Power Train
Transfer Gears - Assemble
TH220B, TH330B and TH340B Telehandlers
Specifications
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Disassemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Transmission Oil Pump - Install
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Hydraulic System
Hydraulic Fan System - Reversing Fan
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Transmission Oil Pump - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Power Train Guard (Transmission) - Remove and Install
D6N Track-Type Tractor Power Train
Final Drive Planetary Carrier (In Chassis) - Install
D6N Track-Type Tractor Power Train
Final Drive Planetary Carrier (In Chassis) - Remove
TH220B, TH330B and TH340B Telehandlers
Tire Shipping Pressure
D5N Track-Type Tractor Power Train
Track Roller Frame - Remove
D5N Track-Type Tractor Power Train
Track Roller Frame - Install
D6R Series II Track-Type Tractor
Operation
D6R Series II Track-Type Tractor
Reference Material
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Assemble
TH350B, TH355B, TH360B and TH460B Telehandlers
Longitudinal Stability Indicator - Test
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Modulating Valve (Transmission Clutch) - Remove
2003/06/02
New Printer Is Used for Caterpillar Payload Control System (PCS) {749P}
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Modulating Valve (Transmission Clutch) - Install
TH350B, TH355B, TH360B and TH460B Telehandlers
Lifting Capacities
D6R Series II Track-Type Tractor
Heating and Air Conditioning Control