Torque Converter - Assemble - Fixed
`
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
[RENR6068]
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Disassemble
POWER TRAIN
TORQUE CONVERTER GP
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Disassemble - Free Wheel
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Assemble - Free Wheel
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Disassemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Assemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Transmission and Torque Converter - Separate
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Transmission and Torque Converter - Connect
1.1. Assembly Procedure
Assembly Procedure
Show/hide table
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 138-7575     | Link Bracket     | 2     |
C     | 2P-8312     | Retaining Ring Pliers     | 1     |
- Lower the temperature of bearing (24) and install bearing (24) into housing (23) .
Show/hide table
![]() | |
Illustration 1 | g00979365 |
- Install bolts (25) into turbine (27). Tighten bolts (25) to a torque of 60 ± 7 N·m (44 ± 5 lb ft).
Show/hide table
![]() | |
Illustration 2 | g00979367 |
- Lower the temperature of hub assembly (26) and install hub assembly (26) .
Show/hide table
![]() | |
Illustration 3 | g00979366 |
- Install a new O-ring seal (20). Install spacer (22). Use Tooling (C) and install retaining ring (21) .
Show/hide table
![]() | |
Illustration 4 | g00981156 |
Note: Check the O-ring seal for wear or for damage. If necessary, replace the O-ring seal.
- Position cover (19) and install retaining ring (18) .
Show/hide table
![]() | |
Illustration 5 | g00979023 |
- Lower the temperature of bearing (17) and install bearing (17) .
Show/hide table
![]() | |
Illustration 6 | g00979368 |
- Position gear (15) onto impeller (16). Install bolts (14). Tighten bolts (14) to a torque of 105 ± 15 N·m (77 ± 11 lb ft).
Show/hide table
![]() | |
Illustration 7 | g00979012 |
- Install retaining ring (13) onto carrier assembly (12) .
Show/hide table
![]() | |
Illustration 8 | g00979011 |
- Use a soft faced hammer and install carrier assembly (12) into impeller (9) .
Show/hide table
![]() | |
Illustration 9 | g00979369 |
- Install spacer (10). Use Tooling (C) and install retaining ring (11) onto carrier assembly (12) .
Show/hide table
![]() | |
Illustration 10 | g00978996 |
- Install stator (7) onto carrier assembly (12). Install retaining ring (5). Use Tooling (C) and install retaining ring (6) .
Show/hide table
![]() | |
Illustration 11 | g00981163 |
- Attach a suitable lifting device and Tooling (A) onto the impeller and carrier assembly. The weight of the impeller and carrier assembly is approximately 36 kg (80 lb). Install bolts (3). Tighten bolts (3) to a torque of 60 ± 7 N·m (44 ± 5 lb ft).
Show/hide table
![]() | |
Illustration 12 | g00978237 |
- Position the torque converter assembly in order to install cover (2). The weight of the torque converter assembly is approximately 75 kg (165 lb). Install Tooling (A) and a suitable lifting device onto cover (2). The weight of cover (2) is approximately 159 kg (350 lb). Install bolts (1). Tighten bolts (1) to a torque of 55 ± 10 N·m (41 ± 7 lb ft).
Show/hide table
![]() | |
Illustration 13 | g00978219 |
End By: Connect the torque converter to the transmission. Refer to Disassembly and Assembly, "Torque Converter - Connect".
Information System:
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train
Transmission - Remove
TH210 and TH215 Telehandlers Power Train
Transfer Gears - Assemble
TH220B, TH330B and TH340B Telehandlers
Specifications
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Disassemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Transmission Oil Pump - Install
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Hydraulic System
Hydraulic Fan System - Reversing Fan
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Transmission Oil Pump - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Power Train Guard (Transmission) - Remove and Install
D6N Track-Type Tractor Power Train
Final Drive Planetary Carrier (In Chassis) - Install
D6N Track-Type Tractor Power Train
Final Drive Planetary Carrier (In Chassis) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Torque Converter - Assemble - Free Wheel
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Disassemble
TH220B, TH330B and TH340B Telehandlers
Tire Shipping Pressure
D5N Track-Type Tractor Power Train
Track Roller Frame - Remove
D5N Track-Type Tractor Power Train
Track Roller Frame - Install
D6R Series II Track-Type Tractor
Operation
D6R Series II Track-Type Tractor
Reference Material
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Relief Valve (Transmission Hydraulic Control) - Assemble
TH350B, TH355B, TH360B and TH460B Telehandlers
Longitudinal Stability Indicator - Test
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Modulating Valve (Transmission Clutch) - Remove
2003/06/02
New Printer Is Used for Caterpillar Payload Control System (PCS) {749P}
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train
Modulating Valve (Transmission Clutch) - Install
TH350B, TH355B, TH360B and TH460B Telehandlers
Lifting Capacities