TH210 and TH215 Telehandlers Power Train Transfer Gears - Assemble Caterpillar


Transfer Gears - Assemble
`
1.1. Assembly Procedure

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
B  1P-0510  Driver Gp 
1P-0520 Driver Gp 
C  5P-5197  Retaining Ring Pliers 
E  147-3508  Socket 

Note: You may heat components for installation purposes and you may cool components for installation purposes. When you heat a component, do not exceed a temperature of 135 °C (275 °F). Do not heat components for more than four hours. Use 1U-8865 Infrared Thermometer in order to check the temperature of the components. Wait until all components have reached a uniform temperature before using a suitable driver to ensure that all the components are properly seated.

  1. Clean all parts and inspect all parts. If any parts are worn or damaged, use new AVSpare parts for replacement.


    Illustration 1g00979359

  2. Place transfer gear case (1) onto a suitable work bench.

  3. Use Tooling (B) to install seal (12) into transfer gear case (1). Lubricate the seal lightly with the lubricant that is being sealed.


    Illustration 2g00978857

  4. Turn over transfer gear case (1). Install bearing (11) into the transfer gear case.


    Illustration 3g00979360


    Illustration 4g00979361

  5. Position transfer gear case (1) with bearing (11) on a suitable vise. Open the jaws of the vise in order to support the inner race of the bearing.


    Illustration 5g00979362

  6. Position input shaft (7) to transfer gear case (1). Place Tooling (B) on top of the input shaft before using a suitable soft mallet in order to install the input shaft.


    Illustration 6g00979363

  7. Place transfer gear case (1) onto the work bench.


    Illustration 7g00979364

  8. Position gear (10) onto input shaft (7). Ensure that the splines on the gear mate with the splines on the input shaft.


    Illustration 8g00979478

  9. Position bearing (9) onto input shaft (7).


    Illustration 9g00979479

  10. Use Tool (E) and Tooling (B) in order to fully install bearing (9) and gear (10) onto the input shaft.


    Illustration 10g00978858

  11. Use Tooling (C) in order to install retaining ring (8) onto input shaft (7).


    Illustration 11g00979480

  12. Install bearing (4) and bearing (5) onto gear (3). Refer to the identification marks that were placed on the components during the disassembly procedure in order to identify the correct orientation of the components.


    Illustration 12g00976256

  13. Install retaining ring (6) onto bearing (5).


    Illustration 13g00976255


    Illustration 14g00979518

  14. Install gear (3) into transfer gear case (1). Refer to the note that was made during the disassembly procedure in order to install the gear with bearing (4) and bearing (5) in the correct positions.


    Illustration 15g00976253

  15. Install transfer gear breather (2) into transfer gear case (1).

End By:

  1. Install the transfer gears. Refer to Disassembly and Assembly Manual, "Transfer Gears - Install".

Information System:

TH220B, TH330B and TH340B Telehandlers Specifications
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Disassemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Transmission Oil Pump - Install
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Hydraulic System Hydraulic Fan System - Reversing Fan
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Transmission Oil Pump - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Power Train Guard (Transmission) - Remove and Install
D6N Track-Type Tractor Power Train Final Drive Planetary Carrier (In Chassis) - Install
D6N Track-Type Tractor Power Train Final Drive Planetary Carrier (In Chassis) - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Assemble - Free Wheel
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Bottom Guard (Engine) - Remove and Install
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Disassemble - Free Wheel
TH350B, TH355B, TH360B, TH460B and TH560B Telehandlers Power Train Transmission - Remove
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Torque Converter - Assemble - Fixed
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Disassemble
TH220B, TH330B and TH340B Telehandlers Tire Shipping Pressure
D5N Track-Type Tractor Power Train Track Roller Frame - Remove
D5N Track-Type Tractor Power Train Track Roller Frame - Install
D6R Series II Track-Type Tractor Operation
D6R Series II Track-Type Tractor Reference Material
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Relief Valve (Transmission Hydraulic Control) - Assemble
TH350B, TH355B, TH360B and TH460B Telehandlers Longitudinal Stability Indicator - Test
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Power Train Modulating Valve (Transmission Clutch) - Remove
2003/06/02 New Printer Is Used for Caterpillar Payload Control System (PCS) {749P}