Trunnion Support (Oscillating Axle, Rear) - Remove and Install
`
950 GC Wheel Loader Power Train
[UENR3335]
950 GC Wheel Loader Power Train
Fixed Axle (Front) - Remove and Install
950 GC Wheel Loader Power Train
Trunnion Support (Oscillating Axle, Front) - Remove and Install
POWER TRAIN
AXLE GP
950 GC Wheel Loader Power Train
Oscillating Axle (Rear) - Remove and Install
950 GC Wheel Loader Power Train
Fixed Axle (Front) - Remove and Install
950 GC Wheel Loader Power Train
Trunnion Support (Oscillating Axle, Rear) - Remove and Install
950 GC Wheel Loader Power Train
Trunnion Support (Oscillating Axle, Front) - Remove and Install
950 GC Wheel Loader Power Train
Parking Brake - Remove and Install
950 GC Wheel Loader Power Train
Axle Housing - Disassemble
950 GC Wheel Loader Power Train
Axle Housing - Assemble
1.1. Removal Procedure
2.1. Installation Procedure
Show/hide table
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 1P-0520 | Driver Group | 1 |
B | - | Loctite 518 | - |
C | 5P-0960 | Grease Cartridge | 1 |
Start By:
- Remove the oscillating axle.
- Remove bolts (1) and cover (2) from rear trunnion support (3).
Show/hide table
Illustration 2 g03717803 - Remove thrust washer (4), bolts (5), and plate (6) from the end of the trunnion. Remove the thrust washer that is behind plate (6).
Show/hide table
Illustration 3 g03717805 - Fasten a suitable lifting device to rear trunnion support (3). Remove the rear trunnion support from the trunnion. The weight of rear trunnion support (3) is approximately
54 kg (118 lb) .Show/hide tableIllustration 4 g00292716 - Remove lip seal (7) and sleeve bearing (8) from the rear trunnion support.
Show/hide table
Illustration 5 g00292717 - Remove bolts (9) and trunnion (10).
Show/hide table
![]() | |
Illustration 1 | g03717798 |
- Apply Tooling (B) on the mating surface between trunnion (10) and the axle housing.
- Install trunnion (10) and bolts (9). Tighten bolts (9) to a torque of
300 ± 40 N·m (221 ± 30 lb ft) .Show/hide tableIllustration 7 g00292716 Show/hide tableIllustration 8 g00296635 - Use a suitable press and Tooling (A) to install sleeve bearing (8) in the rear trunnion support.
Note: Install bearing with groove aligned with grease fitting port.
Show/hide tableIllustration 9 g00292718 (3) Rear trunnion support. (7) Lip seal. (8) Sleeve bearing. (10) Trunnion. Note: The seal must be installed so that the sealing lip is facing toward the outside of the rear trunnion support, as shown.
Show/hide tableIllustration 10 g00296636 - Use Tooling (A) to install lip seal (7) in the rear trunnion support.
Show/hide table
Illustration 11 g03717959 - Fasten a suitable lifting device to rear trunnion support (3). Install the rear trunnion support on the trunnion. The weight of rear trunnion support (3) is approximately
54 kg (118 lb) . - Apply Tooling (C) on the two thrust washers.
Show/hide table
Illustration 12 g03717962 - Install thrust washer, plate (6), thrust washer (4), and bolts (5). Tighten bolts (5) to a torque of
190 ± 30 N·m (140 ± 22 lb ft) .Show/hide tableIllustration 13 g03717971 - Install cover (2) and bolts (1) on rear trunnion support (3). Tighten bolts (1) to a torque of
120 ± 20 N·m (89 ± 15 lb ft) .
Show/hide table
![]() | |
Illustration 6 | g00292717 |
End By:
- Install the oscillating axle.
Information System:
3516B Generator Set Engines with Dynamic Gas Blending
Camshaft Timing
950M and 962M Wheel Loaders Power Train, Steering, Braking, Hydraulic, and Machine Systems
Transfer Gear Bearing Preload - Adjust
2014/12/19
The AccuGrade Blade Angle Sensor Bracket Has Been Relocated and Has a New Designed Cover On Certain D6K2 and D6N Track-Type Tractors {6052, 6060, 6701}
950 GC Wheel Loader Power Train
Fixed Axle (Front) - Remove and Install
525D, 535D, 545D, 555D Wheel Skidder
Engine Operation
C3.4B Engines
DEF Line Heater - Test
950M and 962M Wheel Loaders Power Train, Steering, Braking, Hydraulic, and Machine Systems
Transmission Lubrication
525D, 535D, 545D, 555D Wheel Skidder
Secondary Steering - (If Equipped)
D6N Track-Type Tractor
Brake System
826K Landfill Compactor, 825K Soil Compactor and 824K Wheel Dozer Engine Supplement
Engine, Torque Converter, Transmission and Output Transfer Gears - Install
950M and 962M Wheel Loaders Power Train, Steering, Braking, Hydraulic, and Machine Systems
Output Transfer Gears
950M and 962M Wheel Loaders Power Train, Steering, Braking, Hydraulic, and Machine Systems
Differential Backlash and Bearings - Adjust
D7E Track-Type Tractor
Engine Oil and Filter - Change
950M and 962M Wheel Loaders Power Train, Steering, Braking, Hydraulic, and Machine Systems
Steering Control Valve
3516B Generator Set Engines with Dynamic Gas Blending
Intake Manifold Air Temperature Is High
3500E EPA Tier 4 Final and IMO-II/III Switchable Marine Engines
Engine Control Switch - Test
C280 Marine Engines
Secondary ECM Assumes Control
Fast Fill Hose Inspection On Certain D8TTrack-Type Tractors Equipped With a Fast Fuel Attachment{1273, 1710}
D7E Track-Type Tractor Systems
Electronic Control (Power Train System)
2014/10/16
New Ejector Cylinder Group is Now Used on Certain 631G and 637G Wheel Tractor-Scrapers {5305}
D4, D6K2 and D6K Track-Type Tractor Systems
Electronic Control (Hydraulic System)
C175-16 Locomotive Engine
Configuration Parameters
980L Medium Wheel Loader Power Train, Steering, Braking, Hydraulic, and Machine Systems
Transmission Speed for Forward Directional Shift - Program
980L Medium Wheel Loader Power Train, Steering, Braking, Hydraulic, and Machine Systems
Transmission Speed for Reverse Directional Shift - Program