- Track-Type Tractor
- D9R (S/N: ABK1-UP; ACL1-UP; 7TL1-UP; 8BL1-UP; WDM1-4539)
Introduction
This Special Instruction provides the information that is necessary to install the lift cylinder. The instruction also includes the proper procedure for the installation of the 9SU and 9U Bulldozer with a single tilt cylinder.
Refer to the necessary parts lists in each section.
After assembly is completed, prepare the machine for service. Refer to the Operation and Maintenance Manual for proper machine preparation.
Do not perform any procedure that is outlined in this publication until you have read the information and you understand the information. Do not order any parts until you have read the information and you understand the information.
Reference: Service Manual,Parts Book, Operation and Maintenance Manual.
![]() |
Do not attempt to assemble this machine until you read and you understand the assembly instructions. Improper assembly procedures could result in injury or death. |
NOTICE |
---|
Do not allow any dirt or foreign material to get into the hydraulic system during assembly, connection of lines, when components are filled with fluid, or during any maintenance operation. |
Note: Do not coat any fasteners with grease or special lubricants prior to tightening. A light oil may be used. Instructions are given when lubrication is required.
NOTICE |
---|
Maintain the oil in the hydraulic system at the correct level to prevent pump cavitation. |
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
Approximate Weights
NOTICE |
---|
When a hoist is used to lift any part or assembly, stand clear of the area. Always make sure the hoist has the correct capacity. Approximate weights of the components are shown in the chart which follows. |
Weights For The D9R Bulldozer | |||
---|---|---|---|
Part Number | Description | Weights | |
Universal Blade Group | |
||
Semi-Universal Blade | |
||
Bulldozer Lift Cylinder (Right) | |
||
Bulldozer Lift Cylinder (Left) | |
||
(1) |
Lift Cylinder Gp (Right) | |
|
Lift Cylinder Gp (Left) | |
||
108-8283 | Trunnion Assembly | |
|
8E-6758 | Connector Assembly | |
|
Guard (Tilt Cylinder) | |
||
Brace Assembly | |
||
Left Push Arm Assembly | |
||
Tilt Cylinder Gp (Right) | |
||
Right Push Arm Assembly | |
||
Stabilizer Link Group | |
||
2461039 | Stabilizer Link Gp | |
|
Guard | |
||
Guard Assembly | |
(1) | This part is used on the D9R (S/N: ABK1-UP; ACL1-UP; WDM1-UP) only. |
Shim Adjustment For The Push Arm Assembly
![]() | |
Illustration 1 | g00566579 |
- Remove all of the shims from push arm (1).
- Install push arm (1) and cap (2) on trunnion (3) without shims. Use the largest torque from the following list to tighten the bolts.
- Five percent of the specified torque
-
50 N·m (37 lb ft)
Maintain equal distance on both space (A) and space (B) of cap (2). Insert the maximum amount of shims into spaces (A) and (B).
- Remove the shims and loosen the bolts that are on cap (2). Add one additional shim to the stacks of shims for each side. Reinsert shims into spaces (A) and (B). When possible, use an equal number of shims for spaces (A) and (B).
Note: The number of shims at space (A) must be within one of the number of shims at space (B). For example, if space (A) has eight shims, space (B) must have seven, eight, or nine shims.
- Tighten the bolts that are on cap (2) to the proper torque.
- The push arm should move freely on the trunnion. The specified minimum tolerance is
0.25 mm (0.010 inch) .Note: It may be necessary to remove one or more shims after a short period of time. Wear can be caused by normal vibrations of the surface or variations in the thickness of the paint.
Installation of Lift Cylinders
Necessary Parts
104-3150 104-3152 Cylinder and Lines Group (Lift)
163-1268 163-1269 Cylinder and Lines Group (1) |
|||
---|---|---|---|
Item | Part Number | Description | Qty |
1 | Bracket Assembly | 2 | |
2 | Hose Assembly | 2 | |
2A | Hose As | 2 | |
3 | Hose Assembly | 2 | |
3A | Hose As | 2 | |
4 | Clip | 2 | |
5 | Seal | 8 | |
6 | Bulldozer Lift Cylinder | 2 | |
6A | Lift Cylinder Gp | 2 | |
7 | Flange | 8 | |
8 | Washer | 24 | |
9 | Bolt (3/8 by 1 1/4) | 20 |
(1) | This part is used on the D9R (S/N: WDM1-UP) only. |
9J-7623 Lift Cylinder Mounting Group
246-1043 Cylinder Mounting Gp(1) |
|||
---|---|---|---|
Item | Part Number | Description | Qty |
10 | Bolt (M20) | 8 | |
11 | Hard Washer | 8 | |
12 | Cap As | 4 | |
12A | Yoke | 2 |
(1) | This part is used on the D9R (S/N: WDM1-UP) only. |
104-3154 Lighting Group | |||
---|---|---|---|
Item | Part Number | Description | Qty |
13 | Lamp Group | 2 | |
14 | Clip | 2 | |
15 | Grommet | 2 | |
16 | Nut | 2 | |
17 | Washer | 18 | |
18 | Bolt (3/8 by 1 1/8) | 16 | |
19 | Grommet | 2 | |
20 | Clip | 2 | |
21 | Harness Assembly | 2 | |
22 | Strap | 6 | |
23 | Right-Hand Plate Assembly | 1 | |
24 | Plate | 1 | |
25 | Left-Hand Plate Assembly | 1 | |
26 | Clip | 2 |
125-2001 Lighting Group | |||
Item | Part Number | Description | Qty |
27 | 9W-4361 | Mount | 8 |
28 | 111-8314 | Bracket Assembly | 2 |
29 | 114-2368 | Guard Assembly | 2 |
30 | 147-0319 | Lamp Group | 2 |
31 | 5M-3062 | Bolt (3/8 by 3/4) | 2 |
32 | 5P-1075 | Washer | 18 |
33 | 5P-2955 | Bolt (5/16 by 2 1/2) | 2 |
34 | 6V-8189 | Nut | 2 |
35 | 6V-8801 | Nut | 16 |
36 | 8T-4224 | Washer | 4 |
Installation Procedure
- Tie the rod end of the cylinder to the base of the cylinder. This prevents the cylinder from extending during installation. Perform this procedure for both of the cylinders.
- Remove the flanges and the covers on the ports at the top of each lift cylinder. Perform this procedure for both of the lift cylinders.
Show/hide table
Illustration 3 g01118118 - Install hose assemblies (2, 2A) and (3, 3A) to lift cylinder (6, 6A). Use two seals (5), four flanges (7), eight washers (8) and eight bolts (9). Perform this procedure for both of the lift cylinders. Tighten bolts (9) to a torque of
47 ± 9 N·m (35 ± 7 lb ft) .Show/hide tableIllustration 4 g01118133 - Install clip (4) to lift cylinder (6, 6A). Hose assemblies (2, 2A) and (3, 3A) are marked for orientation.
Show/hide table
Illustration 5 g00564596 - Install bracket assembly (28) to lamp group (30) with bolt (33), two washers (36) and nut (34). Tighten bolt (33) to a torque of
25 ± 6 N·m (18 ± 4 lb ft) and nut (34) to a torque of13 ± 3 N·m (10 ± 2 lb ft) .Show/hide tableIllustration 6 g00566584 - Install guard assembly (29) to left-hand plate assembly (25) with four mounts (27), eight nuts (35) and eight washers (32). Tighten nuts (35) to a torque of
20 ± 4 N·m (15 ± 3 lb ft) . - Install lamp group (13) to guard assembly (29) with bolt (31) and washer (32). Tighten bolt (31) to a torque of
47 ± 9 N·m (35 ± 7 lb ft) . - Connect the plug on harness assembly (21) into lamp group (13).
- Install grommet (19) to left-hand plate assembly (25). Use strap (22) to secure harness assembly (21) to the guard assembly.
Show/hide table
Illustration 7 g01118137 - Use bolt (18), nut (16) and washer (17) to install clip (20) to cylinder group (6, 6A). Install clip (14). Tighten bolt (18) to a torque of
47 ± 9 N·m (35 ± 7 lb ft) .Show/hide tableIllustration 8 g01118143 - Use four bolts (10), four washers (11), and two caps (12) to install cylinder groups (6, 6A) on the yoke (12A). Tighten bolts (10) to a torque of
530 ± 70 N·m (390 ± 50 lb ft) .Note: Items that are not numbered are part of the lift cylinder mounting group.
- Connect harness assembly (21) to the harness assembly that comes out of the radiator guard.
- Install grommet (15). Install clip (26) to the radiator guard. Use straps (22) to secure harness assembly (21).
Note: The leads that are capped to harness assembly (21) are for the optional dual lamp group.
- Repeat Steps 1 through 13 for the other lift cylinder mounting group.
Show/hide table
Illustration 9 g00566620 - Connect hose assemblies (2) and (3) to the manifold on top of the radiator guard with four seals (5), flanges, washers, and bolts.
Note: Items that are not numbered are part of the lift cylinder mounting group.
Show/hide tableIllustration 10 g00566621 - Reinstall the plate with three bolts and three washers. Tighten the bolts to a torque of
25 ± 6 N·m (18 ± 4 lb ft) .Show/hide tableIllustration 11 g01118151 - Remove the bolt that secures shipping bracket (1) on each lift cylinder (6, 6A) to the radiator guard.
Note: Items that are not numbered are part of the lift cylinder mounting group. These items are included with the machine.
![]() | |
Illustration 2 | g00566580 |
Installation of Push Arm Trunnions
Necessary Parts
106-7364 Bulldozer Trunnion | |||
---|---|---|---|
Item | Part Number | Description | Qty |
1 | Trunnion Assembly | 2 | |
2 | Bolt (1 by 2 1/2) | 28 |
Installation Procedure
![]() | |
Illustration 12 | g00566623 |
- Remove shipping cover (A) from the track roller frame.
Note: All mating surfaces must be clean. All mating surfaces must be free of paint. If necessary, clean these surfaces.
Show/hide tableIllustration 13 g00566624 - Remove plug (B) and move plate (C) to the center of the machine as far as possible. Replace plug (B) in the plate and tighten to a torque of
50 ± 5 N·m (37 ± 4 lb ft) . Adequate space for the installation of the trunnion should be available.Note: Check the oil reservoir for the pivot shaft for the correct oil level. Add oil, if necessary.
Show/hide tableIllustration 14 g00566625 - Install the guide pins (approximately
177.8 mm (7 inch) to190.5 mm (7.5 inch) in length) into the track roller frame. - Start trunnion assembly (1) on the guide pins.
Show/hide table
Illustration 15 g00566626 - Install trunnion assembly (1) with 12 bolts (2). Tighten bolts (2) to a torque of
1050 ± 150 N·m (775 ± 111 lb ft) on both sides. - Repeat Steps 1 through 5 for the other side of the machine.
Necessary Parts
102-6345 Semi-Universal Blade and 106-7365 Universal Blade Group | |||
---|---|---|---|
Item | Part Number | Description | Qty |
1 | Pin | 2 | |
2 | Bolt (M24 by 45) | 8 | |
3 | Retainer | 4 | |
4 | Connector Assembly | 2 | |
5 | Pin | 2 |
Item | Part Number | Description | Qty |
---|---|---|---|
6 | Bolt (M10 by 35) | 24 | |
7 | Washer | 28 | |
8 | Bolt (M10 by 50) | 4 | |
9 | Tube Assembly | 1 | |
10 | Flange | 12 | |
11 | Hose Assembly | 1 | |
12 | Hose Assembly | 1 | |
13 | Hose Assembly | 1 | |
14 | Bolt (M10 by 25) | 4 | |
15 | Washer | 4 | |
16 | Right Guard Assembly | 1 | |
17 | Hose Assembly | 1 | |
18 | Guard Assembly | 1 | |
19 | Tube Assembly | 2 | |
20 | Seal | 9 | |
21 | Guard Assembly | 2 | |
22 | Bolt (M12 by 30) | 16 | |
23 | Washer | 16 | |
24 | Bolt (M24 by 40) | 4 | |
25 | Washer | 4 | |
26 | Clip | 4 |
246-1045 Stabilizer Push Arm Gp (1) |
|||
---|---|---|---|
Item | Part Number | Description | Qty |
27 | Push Arm (Right) | 1 | |
28 | Push Arm (Left) | 1 | |
29 | Stabilizer Link Group | 1 | |
29A | Stabilizer Link Gp | 1 | |
30 | Tilt Cylinder (Right) | 1 | |
31 | Brace Assembly | 1 | |
32 | Bolt (M24 by 45) | 8 | |
33 | Retainer | 4 | |
34 | Pin | 2 | |
35 | Pin | 2 |
(1) | This part is used on the D9R (S/N: WDM1-UP) only. |
110-5204 Stabilizer Link Group
246-1039 Stabilizer Link Gp (1) |
|||
---|---|---|---|
Item | Part Number | Description | Qty |
36 | Bolt (M24 by 200) | 8 | |
37 | Cap | 2 | |
38 | Nut | 8 | |
39 | Link Assembly | 1 | |
39A | Link | 1 | |
40 | Shim | 52 |
(1) | This part is used on the D9R (S/N: WDM1-UP) only. |
108-1028 110-5744 Push Arm | |||
---|---|---|---|
Item | Part Number | Description | Qty |
41 | Right Push Arm Assembly | 1 | |
42 | Left Push Arm Assembly | 1 | |
43 | Cap | 2 | |
44 | Bolt (M24 by 240) | 8 | |
45 | Nut | 8 | |
46 | Shim | 52 |
6E-4433 Lift Cylinder
165-8633 Lift Cylinder Gp (1) |
|||
---|---|---|---|
Item | Part Number | Description | Qty |
47 | Cap | 2 | |
48 | Bolt (M24 by 160) | 8 | |
49 | Nut | 8 | |
50 | Shim | 56 |
(1) | This part is used on the D9R (S/N: ABK1-UP; ACL1-UP; WDM1-UP) only. |
Assembly Procedure
- Raise the blade to an upright position. Use appropriate supports. The blade must be in an upright position.
Note: Clean out all bores on the blade.
Show/hide tableIllustration 17 g00568442 - Install connector assembly (4) to left push arm assembly (42). Use pin (35), retainer (33), and two bolts (32). Tighten bolts (32) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) .Note: Ensure that the vertical hole is to the rear of the horizontal hole and pin (35). Improper assembly may damage components. Refer to Illustration 17 for the proper orientation.
- Repeat Step 2 for right push arm assembly (41).
Show/hide table
Illustration 18 g00568441 - Install left push arm assembly (42) with connector assembly to the blade. Use pin (1), retainer (3) and two bolts (2). Tighten bolts (2) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) . - Repeat Step 4 for right push arm assembly (41).
Show/hide table
Illustration 19 g01118259 - Install left brace assembly (31, 31A) to the blade. Use pin (5), retainer (3) and two bolts (2). Tighten bolts (2) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) . - Repeat Step 6 for right tilt cylinder group (30).
Note: The tilt cylinder must be installed with the grease fitting on the rod end toward the ground.
Show/hide tableIllustration 20 g01118266 - Install left brace assembly (31, 31A) to left push arm assembly (42) with pin (34), retainer (33), and two bolts (32). Tighten bolts (32) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) .Note: Use an appropriate lifting device and appropriate pry bar to align the holes.
- Repeat Step 8 for right tilt cylinder group (30).
Show/hide table
Illustration 21 g00571815 - Remove the shipping covers from right tilt cylinder (30). Install tube assembly (9) to the head end of the right tilt cylinder with seal (20), four washers (15), and four bolts (8). Tighten bolts (8) to a torque of
60 ± 12 N·m (44 ± 9 lb ft) . - Secure tube assembly (9) to right-hand tilt cylinder (30). Use bolt (22) and washer (23). Tighten bolt (22) to a torque of
105 ± 20 N·m (77 ± 15 lb ft) .Show/hide tableIllustration 22 g01118290 - Install stabilizer link group (29, 29A) to the blade. Use cap (37), four bolts (36), four nuts (38) and shims (40). Tighten bolts (36) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) . Refer to the topic “Shimming Procedure” in this Special Instruction for shimming instructions.Note: Make sure that the end of stabilizer link group (29, 29A) with six bosses for the lines guard is installed to the blade. The opposite end of stabilizer link group (29, 29A) has only two bosses.
Show/hide tableIllustration 23 g01118291 Stabilizer link group
(A)62.5 ± 5 mm (2.46 ± .20 inch)
(B)122.5 ± 5 mm (4.82 ± .20 inch) - Position tube assemblies (19) to dimension (A) of
62.5 mm (2.46 inch) and dimension (B) of122.5 mm (4.82 inch) on stabilizer link group (29, 29A). - Clamp tube assemblies (19) to stabilizer link group (29, 29A) with four clips (26), three bolts (14), and three washers (7). Tighten bolts (14) to a torque of
60 ± 12 N·m (49 ± 9 lb ft) .Show/hide tableIllustration 24 g00569679 - Connect hose assemblies (11) and (12) to tube assemblies (19) with two seals (20), four flanges (10), eight washers (7) and eight bolts (6). Tighten bolts (6) to a torque of
60 ± 12 N·m (44 ± 9 lb ft) . - Connect the other end of hose assemblies (11) to the rod end of the tilt cylinder (30) and tube assembly (9) with two seals (20), four flanges (10), eight washers (7) and eight bolts (6). Tighten bolts (6) to a torque of
60 ± 12 N·m (44 ± 9 lb ft) .Show/hide tableIllustration 25 g01118292 - Connect hose assemblies (13) and (17) to the tube assemblies with two seals (20), four flanges (10), eight washers (7) and eight bolts (6). Tighten bolts (6) to a torque of
60 ± 12 N·m (44 ± 9 lb ft) .Show/hide tableIllustration 26 g00569682 - Install guard assembly (16) to the right tilt cylinder (30) with four washers (25) and four bolts (24). Tighten bolts (24) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) .Show/hide tableIllustration 27 g01118294 - Install guard assemblies (21) to each end of stabilizer link group (29, 29A) with eight washers (23) and eight bolts (22). Install center guard assembly (18) to the stabilizer link group with four washers (23) and four bolts (22). Tighten bolts (22) to a torque of
105 ± 20 N·m (77 ± 15 lb ft) .
![]() | |
Illustration 16 | g00565016 |
Bulldozer Installation
- Block the push arms to the height of the trunnions.
- Remove four nuts (45), four bolts (44), cap (43), and shims (46) from both push arms.
- Move the machine into the push arms. Turn off the engine.
Show/hide table
Illustration 29 g00568437 - Install cap (43) to left push arm (28) with shims (46), four bolts (44) and four nuts (45). Tighten bolts (61) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) . Refer to the topic “Shimming Procedure” in this Special Instruction for shimming instructions. - Repeat Steps 1 through 4 for the other side of push arm (27).
Show/hide table
Illustration 30 g00600076 - Fasten left lift cylinder and right lift cylinder to the blade with caps (47), shims (50), four bolts (48) and four nuts (49). Tighten bolts (48) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) .Show/hide tableIllustration 31 g01118295 - Install stabilizer link group (29, 29A) to the trunnion with cap (37), shims (40), four bolts (36), and four nuts (38). Refer to the topic “Shimming Procedure” in this Special Instruction for shimming instructions. Tighten bolts (36) to a torque of
900 ± 100 N·m (664 ± 74 lb ft) .Note: Hose assemblies are installed on stabilizer link group (29, 29A) while the stabilizer link group is on the ground. Lift stabilizer link group (29, 29A) into position and install the hose assemblies to the proper ports on the radiator guard.
Show/hide tableIllustration 32 g00569689 Show/hide tableIllustration 33 g01118296 Forward view from the operator station - Connect hose assemblies (13) and (17) to the hydraulic ports on the radiator guard. Use two seals (20), four flanges, eight washers, and eight bolts. Tighten the bolts to a torque of
60 ± 12 N·m (44 ± 9 lb ft) .Note: Items that are not numbered are part of the lines group for the lift cylinders. These items are included with the machine.
- Check the oil in the hydraulic tank. If necessary, fill the hydraulic tank. Cycle the cylinders by a full stroke. Cycle in both directions to purge air from lines and cylinders. Refill the hydraulic tank to the FULL mark.
- After assembly is complete, prepare the machine for operation. Refer to the Operation and Maintenance Manual for proper machine preparation.
![]() | |
Illustration 28 | g00569686 |