963C Track-Type Loader Track - Check/Adjust Caterpillar


Track - Check/Adjust
`
963C Track-Type Loader [SEBU7403]
UNDERCARRIAGE
TRACK ADJUSTER & RECOIL GP
963C Track-Type Loader Track - Check/Adjust
1.1. Check the Track
2.1. Track Adjustment
3.1. Bolt Torque for Track Shoes

Check the Track

Check the track for wear and for excessive dirt buildup.

  1. Move the machine forward to a distance that is two times the length of the machine. Allow the machine to stop without the use of the service brake. Shut off the engine.


    Illustration 1g00663282

  2. Stand on the track between the front idler and the track carrier roller in order to produce as much track sag as possible.

  3. Attach one end of a string to the grouser tip on the track shoe that is directly above track carrier roller (1). Make the string tight by pulling on the string. Attach the opposite end of the string to the grouser tip on the track shoe (2) that is directly above the front idler .

  4. Measure the distance between the string and the tip of the grouser that is on the track shoe directly between the front idler and the track carrier roller in order to obtain dimension (A).

  5. Dimension (A) should be approximately 50 mm (2.0 inch). If dimension (A) is not correct, adjust the track.

Track Adjustment

------ WARNING! ------

Grease is under high pressure.

Grease coming out of the relief valve under pressure can penetrate the body causing injury or death.

Do not watch the relief valve to see if grease is escaping. Watch the track or track adjustment cylinder to see if the track is being loosened.

Loosen the relief valve only one turn.


  1. Move the machine forward for a distance of two times the length of the machine. Allow the machine to a stop without the use of the service brakes. Shut off the engine. Adjust the tracks while you are in the machine's typical operating conditions. If packing conditions prevail on the job, the tracks should be adjusted with packing material.


    Illustration 2g01059608

  2. Remove the cover for the track adjusting mechanism.


    Illustration 3g00275290

  3. Add grease with a grease gun in order to move the idler forward until the track is fully tight.


    Illustration 4g00275291

  4. Use a straight edge against the face. Mark the rod with a pencil or with a marking pen. Make a mark that is in line with the face.


    Illustration 5g00275292

  5. Mark the rod 10 mm (.40 inch) toward the idler from the first mark.

  6. Open the relief valve. Allow the idler to move back until the second mark is behind the face. Close the relief valve.

  7. Use the grease gun to move the idler forward until the second mark is in line with the face.


    Illustration 6g00563913

  8. Measure dimension (X), as shown above. Dimension (X) is the distance from the face of the bulkhead to the center of the pin in the yoke. If dimension (X) is less than 98 mm (3.9 inch), proceed to Step 9.

    If dimension (X) is greater than 98 mm (3.9 inch), the front idler must be moved forward to a secondary position. Refer to Power Train Disassembly and Assembly, RENR5232, "Track - Adjust" for this procedure.

  9. Install the cover and tighten the bolts to a torque of 75 ± 15 N·m (55.50 ± 11 lb ft).

    Note: The track sag after this adjustment procedure should be 50.0 mm (2.0 inch). If track sag is not 50.0 mm (2.0 inch), repeat the procedure.

  10. Repeat Step 2 through Step 9 for the other track.

Bolt Torque for Track Shoes



Illustration 7g00275294

The torque requirement for track shoe bolts is 170 ± 40 N·m (120 ± 30 lb ft). Tighten the bolts for an additional 120 degrees. If you are using bolts with a master link, tighten the bolts to a torque of 170 ± 40 N·m (120 ± 30 lb ft). Tighten the bolts for an additional 180 degrees.

Information System:

IT62G Integrated Toolcarrier and 950G and 962G Wheel Loaders Cooling System Coolant Sample (Level 1) - Obtain
2003/03/31 Correction to Disassembly and Assembly , "Bucket" {6101}
TH350B, TH355B, TH360B and TH460B Telehandlers Braking System - Test
AD30 Underground Articulated Truck Engine Air Filter Secondary Element - Replace
AD30 Underground Articulated Truck Screen (Torque Converter) - Clean
AD30 Underground Articulated Truck Steering Cylinder Bearings - Lubricate
D6N Track-Type Tractor Machine Systems Bulldozer Control Valve - Assemble
D6N Track-Type Tractor Machine Systems Bulldozer Control Valve - Disassemble
IT62G Integrated Toolcarrier and 950G and 962G Wheel Loaders Safety Messages
2003/03/31 Correction to Disassembly and Assembly , "Piston Pump (Steering) - Disassemble" {4306, 5070}
651E and 657E Wheel Tractor-Scrapers Power train Power Train Troubleshooting
C7 Engines for Caterpillar Built Machines Crankshaft Front Seal - Install
C15 and C18 Generator Set Engines Crankshaft Main Bearings - Install
C15 On-Highway Engine Crankshaft - Remove
C15 and C18 Generator Set Engines Crankshaft Main Bearings - Remove
C15 and C18 Generator Set Engines Connecting Rod Bearings - Install
C15 On-Highway Engine Camshaft - Install
C15 On-Highway Engine Camshaft - Remove
C15 On-Highway Engine Pistons and Connecting Rods - Assemble
C15 and C18 Generator Set Engines Pistons and Connecting Rods - Disassemble
C15 On-Highway Engine Crankshaft - Install
C15 and C18 Generator Set Engines Connecting Rod Bearings - Remove
C15 and C18 Generator Set Engines Pistons and Connecting Rods - Install
C7 Engines for Caterpillar Built Machines Camshaft Idler Gear - Remove and Install