992 WHEEL LOADER Every 10 Service Hours Caterpillar


Every 10 Service Hours
`
992 WHEEL LOADER [GEG00131]
MACHINE ARRANGEMENT
992 WHEEL LOADER Every 10 Service Hours
992 WHEEL LOADER Every 250 Service Hours
1.1. (4)Bucket Positioner Tube
2.1. (5)Bucket Positioner Bearings
3.1. (6)Bucket Control Cylinders And Linkage Bearings
4.1. (7)Lift Arm And Lift Cylinder Bearings
5.1. (8)Radiator
6.1. (9)Precleaner

(4)Bucket Positioner Tube

Fill oil cup.

(5)Bucket Positioner Bearings

Lubricate 2 fittings.

(6)Bucket Control Cylinders And Linkage Bearings

Lubricate 4 fittings on each side of machine.

Lubricate 2 fittings on each side.

Lubricate 4 fittings on each side.

(7)Lift Arm And Lift Cylinder Bearings

Lubricate 1 fitting on each side.

Lubricate 2 fittings on each side.

Lubricate 3 fittings on each side.

(8)Radiator

1. Remove cap slowly to relieve pressure.

2. Maintain coolant level at bottom of fill pipe.

(9)Precleaner

1. Remove precleaner rain cover and inspect tube openings.

2. If precleaner needs cleaning, remove and wash in warm water or brush or blow dirt from housing and tubes.

3. Install precleaner and rain cover.